Architectural Interiors have done an unbelievable job - from start to finish. Our office came in on budget and on time with the.....

Full Client List

Trafalgar square - Case Study

trafalgar-square


project Trafalgar Sq, Café & Toilet Facility   timescale Twelve weeks on site
location Trafalgar square, London  
  Square area 1,200sqft
  averages £300 per sqft


How we met the challenge

The Lord Mayor of London commissioned a design for a café and toilet area in Trafalgar Square. We provided a modern scheme by incorporating honed granite floors and walls with stainless steel, coloured glass, and a grey painted seamless ceiling with down-lighters in both the toilet and café areas. This great project opportunity meant that we could design something exciting and new for visitors coming to Trafalgar Square.

Once the base build was finished we set about surveying the space to make sure that it was true to the drawing. The granite had been ordered a few weeks before so we were ready to start installing the floor and walls together with the position of services which ran under the floor.

Once concepts had been approved we provided a detailed design for the construction team. Particular attention was given to the finishes, lighting and robust details as it was stipulated in the brief that all fittings needed to be hardwearing to deal with constant use.

From the design approval process we were able to manufacture all product and stainless steel panelling to install once the floors and walls had been clad with stone. We began with the installation of the stainless steel toilet cubicles and hand washing facilities and then moved onto the café. Here we had to install specialist units and food preparation equipment.

The ceilings were skimmed with the light roses in situ as the base build was constructed in concrete on both sides of the square. Glass panels and furniture were then installed into each space.

We worked very closely with the contracts team to make sure that the design was implemented from our initial concept. Once the installation was completed we felt that we had achieved something of great value to Trafalgar Square. Our client was also very excited by our input and they felt that we had exceeded all expectations.

As one of the smallest most challenging projects, we have done, we felt that it really became an engineering project rather than architectural work piece. Due to the level of detail required, from the smallest of handles to the detailed stainless steel panels in the toilet area, every detail had to be considered and approved before installation.


Moving Office?

Should you stay or should you go?

If you are coming to the end of your agreed lease, or you have an option to break and move from your existing...

Moving office solutions

Expanding or downsizing?

is your business changing?

The question is - do you have enough space in your office to leave room for growth? Will it scale up or...

Expanding or Downsizing

Running out of space?

Could you make more of the space you already have?

Can my existing space be adapted to support my business now and in the future? There are numerous...

Running Out of Space

Office looking tired?

Why not transform your office into a place that not only looks great but works better too?

We can easily show you low cost techniques to improve your space and create an efficient working...

Office looking tired

Require new furniture and/or storage?

Bums on seats or is it?

We can give you informed advice on the best products for your workplace. Remember not every...

New furniture or storage